patios: day 6

brrrrrrrrrrrrrrrrrrrrrrrrrrr!!! 23 degrees this morning and it barely reached freezing today. Brisk wind didn’t make it any warmer, that’s for sure. Still, the Land Design Associates crew was here at 8 a.m. with their woolies on.

With temps this low, they couldn’t do anything involving concrete. Installing the flexible pond liner is a no go too as apparently it gets brittle below freezing. That made it a clean-up day instead.

Fill went in around the backside of the pond walls…

day 6 backfill

The floor of the pond was raised up some with base, raked to level, tamped down…

day 6 boys at work

day 6 eod

Piles of soil were leveled out and the yard was graded back to something manageable. Then the pond and patio area were covered in thermal blankets again to keep the ground pliable…

day 6 thermal blankets

The stone pavers can’t go onto the patio until the pond liner is in and the coping around the edge of the pond is installed. Soooooo… looks like we’ll have a wait for the temps to rise before much more can be done up top. There is, however, a chance the lower patio may go in tomorrow.

Shall we  consult the Magic Eight Ball to see what it has to say about that?

——————————

Day 5

Day 4

Day 3

Day 2

Day 1

Tags: , , ,

One Response to “patios: day 6”

  1. […] again. Tomorrow we’re meeting with Jim Egan of Land Design Associates for the first time since early December. Up for discussion: how to get across the koi […]

Leave a Reply